bool
If true, automatic scheduling of data
transfer runs for this configuration will be
disabled. The runs can be started on ad-hoc
basis using StartManualTransferRuns API. When
automatic scheduling is disabled, the
TransferConfig.schedule field will be ignored.
start_time
google.protobuf.timestamp_pb2.Timestamp
Specifies time to start scheduling transfer
runs. The first run will be scheduled at or
after the start time according to a recurrence
pattern defined in the schedule string. The
start time can be changed at any moment. The
time when a data transfer can be triggered
manually is not limited by this option.
end_time
google.protobuf.timestamp_pb2.Timestamp
Defines time to stop scheduling transfer
runs. A transfer run cannot be scheduled at or
after the end time. The end time can be changed
at any moment. The time when a data transfer can
be triggered manually is not limited by this
option.