Reference documentation and code samples for the Cloud OS Config V1 API class Google::Cloud::OsConfig::V1::WeekDayOfMonth.
Represents one week day in a month. An example is "the 4th Sunday".
Inherits
- Object
Extended By
- Google::Protobuf::MessageExts::ClassMethods
Includes
- Google::Protobuf::MessageExts
Methods
#day_of_week
def day_of_week() -> ::Google::Type::DayOfWeek
Returns
- (::Google::Type::DayOfWeek) — Required. A day of the week.
#day_of_week=
def day_of_week=(value) -> ::Google::Type::DayOfWeek
Parameter
- value (::Google::Type::DayOfWeek) — Required. A day of the week.
Returns
- (::Google::Type::DayOfWeek) — Required. A day of the week.
#day_offset
def day_offset() -> ::Integer
Returns
-
(::Integer) — Optional. Represents the number of days before or after the given week day
of month that the patch deployment is scheduled for. For example if
week_ordinal
andday_of_week
values point to the second day of the month and thisday_offset
value is set to3
, the patch deployment takes place three days after the second Tuesday of the month. If this value is negative, for example -5, the patches are deployed five days before before the second Tuesday of the month. Allowed values are in range [-30, 30].
#day_offset=
def day_offset=(value) -> ::Integer
Parameter
-
value (::Integer) — Optional. Represents the number of days before or after the given week day
of month that the patch deployment is scheduled for. For example if
week_ordinal
andday_of_week
values point to the second day of the month and thisday_offset
value is set to3
, the patch deployment takes place three days after the second Tuesday of the month. If this value is negative, for example -5, the patches are deployed five days before before the second Tuesday of the month. Allowed values are in range [-30, 30].
Returns
-
(::Integer) — Optional. Represents the number of days before or after the given week day
of month that the patch deployment is scheduled for. For example if
week_ordinal
andday_of_week
values point to the second day of the month and thisday_offset
value is set to3
, the patch deployment takes place three days after the second Tuesday of the month. If this value is negative, for example -5, the patches are deployed five days before before the second Tuesday of the month. Allowed values are in range [-30, 30].
#week_ordinal
def week_ordinal() -> ::Integer
Returns
- (::Integer) — Required. Week number in a month. 1-4 indicates the 1st to 4th week of the month. -1 indicates the last week of the month.
#week_ordinal=
def week_ordinal=(value) -> ::Integer
Parameter
- value (::Integer) — Required. Week number in a month. 1-4 indicates the 1st to 4th week of the month. -1 indicates the last week of the month.
Returns
- (::Integer) — Required. Week number in a month. 1-4 indicates the 1st to 4th week of the month. -1 indicates the last week of the month.